Client: ‘LUKOIL Neftohim Bourgas’ AD

Category: ‘Turn-key’ projects

Contacting Authority: ‘LUKOIL Neftohim Bourgas’ AD

Contractor: ‘DietsmannEnergoremont’ JSC

Subject of the contract:

DESIGN, delivery and construction (ЕРС) No А201601687

Construction of a new furnace П-101 and a boiler-utiliser in AD-4 System, Production department ‘Atmospheric and vacuum distillation’ (AVD)

The site is ‘turn-key’ type and includes the following main activities for the implementation of the project:

  • Design;
  • Production, delivery and installation of metal structures;
  • Production, delivery, installation and commissioning of main technological equipment;
  • Production, delivery, installation and commissioning of electrical control & measuring equipment;
  • 72-hour tests under load

Start:   January 2017

End:    June 2018